Laserfiche WebLink
TZE "TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 66 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI Se tember 17, 2008 1 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Jose Ramirez <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil warm and breezy Aaron Lickingteller <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers,2 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer w/slope- <br /> board,excavator,623 scraper, 16 G Motograder,825 compactor,smooth drum roller,backhoe,2 x 735 rock trucks, i forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn placed operations layer soil on the west half of the 2:1 slope. <br /> - The secondary leak location process was completed and no holes were found. <br /> - Operations layer placement was started on the eastern cell boundary in preparation for the eastern <br /> berm development. <br /> - Guinn completed pea gravel placement adjacent to the southern berm and rolled the filter geotextile <br /> out on top to cover it so operations layer could be placed as well. The geotextile area was already <br /> incorporated into the first day's deployment. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />