Laserfiche WebLink
1W 'WV_T r-ITOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 67 <br /> Location of Work: Client Or Manager Date: F�hursday <br /> ay of The Week: <br /> Manteca, CA Forward/AWI Se tember 18, 2008 <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Jose Ramirez <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil warm and breezy Aaron Lickingteller <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers,2 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer w/slope- <br /> board,excavator,623 scra er, 16 G Motograder,825 com actor,smooth drum roller,backhoe,2 x 735 rock trucks, 1 forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn placed the final 26,123 square feet of 7-oz. filter geotextile between the pea gravel and <br /> operations layer soil that it also placed along the western tie-in of the cell floor. <br /> - Operations layer placement was completed on the eastern cell boundary and the area has been <br /> prepped for the eastern berm development. <br /> - Operations layer placement was completed on the eastern half of the 2:1 slope. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />