My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_27
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:54:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-08 October 2008 <br /> Forward Landfill Project No.021605.08 <br /> 4.0 EARTHWORKS CONSTRUCTION <br /> As the earthworks construction was implemented, Vector performed CQA <br /> monitoring. This section describes the CQA tasks associated with the construction <br /> of the earthworks components of the WMU FU-08 composite liner system. The <br /> elements monitored by Vector and discussed within this section include subgrade <br /> preparation, LPSL placement, LCRS granular drainage material placement, and <br /> placement of the protective operations soil layer. <br /> The earthworks CQA activities performed by Vector for the WMU FU-08 composite <br /> liner construction included: <br /> ® monitoring of subgrade preparation; <br /> • collecting samples of the LPSL material; <br /> ® monitoring and testing of LPSL placement; <br /> ® reviewing geotechnical laboratory testing result for compliance with <br /> project specifications; <br /> IMMI& <br /> 4Pa observing installation of a leachate collection and removal system <br /> (LCRS); and <br /> ® monitoring placement of protective operations/drainage soil layer. <br /> 4.1 Excavation <br /> The majority of the excavation was completed prior to Vector arriving on-site. <br /> Therefore, only minor excavation and shaping of the slopes was required within <br /> WMU FU-08. Prior to excavation, clearing and grubbing activities were conducted <br /> for removal of all deleterious materials such as grass, roots, or other organic <br /> vegetative materials. Upon completion of the excavation, RJA and Associates <br /> surveyed the as-built subgrade. The survey was reviewed by Vector for <br /> completeness. <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.