My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_27
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:54:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-08 October 2008 <br /> Forward Landfill Project No.021605.08 <br /> • peel strength (ASTM D-4632, modified for 180 degree peel of GCL); <br /> and <br /> • interface shear strength. <br /> Two (2) GCL samples were tested for conformance. Based on 174,750 ft2 of GCL <br /> received, the testing frequency was one test per 87,375 ft2, which satisfies the <br /> requirement of one test per 100,000 ft2. <br /> Interface shear testing was conducted for the GCL/geomembrane/geocomposite <br /> interface. Results of the conformance testing indicated that the materials met the <br /> requirements of the project specifications. A summary of the conformance test <br /> results is presented in Table 8. Detailed test results, including the GCL interface <br /> tests, are provided within Appendix H. <br /> TABLE8 <br /> GCL CONFORMANCE TESTING SUMMARY <br /> TEST RESULTS <br /> ASTM D4632 ASTM D 5993 ASTM D 5887 <br /> SAMPLE PEEL MASS PER UNIT HYDRAULIC <br /> O. STRENGTH AREA CONDUCTIVITY <br /> (LBS) (LBS/FT2) (CM/SEC) P/F <br /> SPECS 35(min.) 0.75 @ 0% M.C. 5 x 10-9(max.) <br /> -- <br /> 7236 52 1.12 2.6 x 10-9 P <br /> 7271 52 1.13 2.3 x 10-9 P <br /> 5.2.3 GCL Installation <br /> 5.2.3.1 GCL Deployment <br /> CQA activities during GCL deployment include field panel identification and panel <br /> placement as described below: <br /> Field Panel identification: Prior to GCL deployment, Vector's CQA Monitor and <br /> Comanco (liner contractor) discussed and agreed to the identification code for each <br /> panel deployed. During the deployment, Vector's CQA Monitor observed that the <br /> Vector Engineering, Inc. • 143E Spring Hill Drive-Grass Valley, CA 95945•(530)272-2448 <br /> -21- <br />
The URL can be used to link to this page
Your browser does not support the video tag.