My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_27
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:54:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-08 October 2008 <br /> Forward Landfill Project No.021605.08 <br /> subcontractor marked the deployed panels and that each panel placed was marked <br /> with the manufacturer's roll number. <br /> Field Panel Placement: During the panel placement, Vector's CQA Monitor <br /> recorded panel deployment logs. These logs recorded the location (panel number and <br /> roll number), installation schedule (date and time), weather conditions <br /> (temperature and wind), and GCL type. To protect the GCL, HDPE liner was <br /> deployed concurrently with the GCL placement. The GCL panel deployment logs <br /> are presented in Appendix H. <br /> 5.2.3.2 Defects and Repairs <br /> Vector's CQA Monitor inspected all seams and non-seam areas of the GCL for <br /> defects, holes, displaced panels, premature hydration, and signs of contamination <br /> by foreign material. <br /> Vector's CQA Monitor recorded defects as part of the daily construction report. <br /> Appropriate repairs were completed prior to installation of the overlying HDPE <br /> material. <br /> .3 Geomembrane <br /> 5.3.1 Geomembrane Material <br /> A 60-mil thick high-density polyethylene (HDPE) geomembrane manufactured by <br /> AgruAmerica was used in the liner system for WMU FU-08. In addition, existing <br /> geomembrane material from WMU FU-06 was also used in FU-08. The existing <br /> geomembrane material was approved for use during FU-06 construction. <br /> Double-sided textured was deployed on the floor and single-sided textured was used <br /> on the side-slopes of WMU FU-08 with the exception of a partial roll of single-sided <br /> geomembrane used on approximately 11,000 square feet of the eastern termination <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -22- <br />
The URL can be used to link to this page
Your browser does not support the video tag.