My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_27
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:54:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-08 October 2008 <br /> Forward Landfill Project No.021605.08 <br /> • asperity height (GRI GM-12); and <br /> • interface shear strength testing. <br /> A total of five (5) 60-mil thick HDPE geomembrane samples were tested for <br /> conformance. The five samples consist of three (3) for the double-sided <br /> geomembrane and two (2) for the single sided geomembrane. Based on 424,611 ft2 <br /> of HDPE received, this testing frequency corresponds to one test per 84,923 ft2 <br /> which satisfies the requirement of one test per 100,000 ft2. Results of the <br /> conformance testing indicated that the materials met the requirements of the <br /> project specifications. <br /> In addition, large-scale direct shear testing was conducted on the <br /> clay/geomembrane and geomembrane/geotextile interfaces (the GCL interface shear <br /> testing is discussed in Section 5.1). Results of the conformance testing indicated <br /> that the materials met the requirements of the project specifications. A summary of <br /> the conformance test results is included in Table 9. Detailed test results including <br /> the geomembrane/geotextile interface shear tests are included in Appendix I. <br /> 5.3.2 Geomembrane Installation <br /> 5.3.2.1 Geomembrane Deployment <br /> Surface Preparation: Prior to installation of the HDPE, Vector's CQA Monitor <br /> inspected that the GCL has been installed as specified by the project specifications <br /> and there was no change in surface condition that required repair work. <br /> Layout Drawing: The liner contractor, GSE, submitted a proposed panel layout <br /> drawing that showed the general panel configurations and dimensions. The <br /> drawings were approved by Vector prior to the installation of the HDPE <br /> geomembrane. Panel layout drawings are included in Appendix I. <br /> Vector Engineering, Inc. • 143E Spring Hill Drive• Grass Valley, CA 95945•(530)272-2448 <br /> -24- <br />
The URL can be used to link to this page
Your browser does not support the video tag.