Laserfiche WebLink
WMU FU-08 October 2008 <br /> Forward Landfill Project No. 021605.08 <br /> on the north side of the cell, just in the trench area. The modification was done <br /> with the approval of the design engineer. <br /> The installation and documentation of the two types of materials was the same. <br /> Therefore, the installation procedures and testing described below pertains to both <br /> material types. <br /> 5.3.1.1 Receiving Inspection <br /> Upon arrival by truck shipment, Vector's CQA monitor observed the unloading and <br /> storage of the geomembrane rolls. Each roll of geomembrane was logged in by roll <br /> number and then crosschecked against the quality control documents provided by <br /> the supplier. Following the inspection and approval of QC certifications, the <br /> material was approved for installation. A copy of the log of geomembrane received <br /> is included in Appendix I. The manufacturer's QC data is also included in <br /> Appendix I. The inventory logs include the roll existing from the U-06 <br /> construction project. The MQC certifications and conformance test results for this <br /> material was reviewed and approved during FU-06 construction and the <br /> documentation for these rolls is included in the Final Report for FU-06. <br /> 5.3.1.2 CQA Conformance Testing <br /> Select samples of the HDPE were cut from random rolls of the geomembrane at the <br /> manufacturing plant by the third party testing laboratory for conformance testing <br /> in accordance with the project specifications and CQA manual. Conformance testing <br /> included: <br /> • density (ASTM D-1505); <br /> • carbon black content (ASTM D-4218); <br /> • carbon black dispersion (ASTM D-5596); <br /> • thickness (ASTM D-5994); <br /> • tensile properties (ASTM D-6693); <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -23- <br />