Laserfiche WebLink
Tie 3. <br />SEAM PEEL AND SHEAR TEST RESULTS <br />CLIENT: VECTOR ENGINEERING MATERIAL: HDPE SEAM <br />PROJECT: Forward Landfill SEAM TYPE. Fusion Weld <br />DATE RECD: 18 -Aug -08 PGL JOB #. G081025 <br />re I <br />QC'd By.- <br />TEST <br />y:TEST METHOD: ASTM D6392 <br />DATE REPORT: 18 -Aug -08 <br />Crosshead Speed: 2 in/min Crosshead Speed: 2 in/min <br />SHEARNEVA PEEL EVALUATION <br />MAXIMUM % Locus PROJECT MAXIMUM % LOCUS PROJECT <br />SAMPLE PGL STRENGTH Elongation of SPEC. SPECIMEN STRENGTH INCURSION OF SPEC. <br />ID CONTROL # Ian width) Break Ibrn width NUMBER Ibfin width % BREAK ibrn width <br />OS45 <br />48807 <br />183 <br />> 50% <br />BRK <br />1 Outside <br />130 <br />0 <br />SE1 <br />SEI <br />OLD CELL/6 <br />SE2 <br />181 <br />> 50% <br />BRK <br />2 Outside <br />124 <br />0 <br />SEI <br />SIP <br />SEPARATION IN THE PLANE OF THE SHEET. <br />BRK1 <br />190 <br />> 50% <br />BRK <br />3 Outside <br />116 <br />0 <br />SE1 <br />AD-BRK <br />BREAK IN FIRST SEAM AFTER SOME ADHESION FAILURE, <br />184 <br />> 50% <br />BRK <br />4 Outside <br />116 <br />0 <br />SE1 <br />187 <br />> 50% <br />BRK <br />5 Outside <br />110 <br />0 <br />SE1 <br />AVG: <br />119 <br />STD. DEV. <br />8 <br />1Inside <br />116 <br />0 <br />SEI <br />2lnside <br />112 <br />0 <br />SE1 <br />3lnside <br />112 <br />0 <br />SE1 <br />4lnside <br />116 <br />0 <br />SE1 <br />5lnside <br />126 <br />0 <br />SE1 <br />AVG. <br />186 <br />AVG: <br />116 <br />STD. DEV. <br />4 <br />STD. DEV. <br />6 <br />DS -S6 49808 <br />174 <br />> 50% BRK 1 Outside <br />112 <br />0 <br />SE1 <br />OLD CELL111 <br />173 <br />> 50% BRK 2 Outside <br />116 <br />0 <br />SE1 <br />185 <br />> 50% BRK 3 Outside <br />110 <br />0 <br />SE1 <br />173 <br />> 50% BRK 4 Outside <br />110 <br />0 <br />SEI <br />181 <br />> 50% BRK 5 Outside <br />112 <br />0 <br />SE1 <br />AVG: <br />112 <br />STD. DEV. <br />2 <br />1Inside <br />108 <br />0 <br />SEI <br />2lnside <br />114 <br />0 <br />SE1 <br />3lnside <br />114 <br />0 <br />SE1 <br />4lnside <br />118 <br />0 <br />SE1 <br />5lnside <br />116 <br />0 <br />SE1 <br />AVG: <br />177 <br />AVG: <br />I <br />114 <br />STD. DEV. <br />5 <br />STD. DEV. <br />4 <br />BREAK DESC q' ION (ASDA DWS2 FUMN: EXTRUSION: <br />ADI <br />ADHESION FAILURE. SPECIMENS DELAMINATED UNDER THE BEAD. <br />AD <br />ADHESION FAILURE. <br />AD2 <br />ADHESION FAILURE. <br />BRK <br />BREAK IN SHEETING, <br />AD-WLD <br />BREAK THROUGH THE FILLET, <br />SE1 <br />BREAK AT OUTER EDGE OF SEAM. <br />SEI <br />BREAK AT BOTTOM EDGE OF SEAM. <br />SE2 <br />BREAK AT INNER EDGE OF SEAM. <br />SE2 <br />BREAK AT TOP EDGE OF SEAM. <br />AD-BRK <br />BREAK IN FIRST SEAM AFTER SOME ADHESION FAILURE. <br />SE3 <br />BREAK AT BOTTOM EDGE OF SEAM (for PEEL only) <br />SIP <br />SEPARATION IN THE PLANE OF THE SHEET. <br />BRK1 <br />BREAK IN BOTTOM SHEETING. <br />BRK2 <br />BREAK IN TOP SHEETING. <br />AD-BRK <br />BREAK IN FIRST SEAM AFTER SOME ADHESION FAILURE, <br />HT <br />BREAK AT EDGE OF HOT TACK <br />SIP SEPARATION IN THE PLANE OF THE SHEET. <br />Precision Geosynthetic Laboratories * s' <br />