My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_27
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:54:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rurTOR <br /> INEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 1 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,CA Forward/AWT June 13,2008 Friday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn COmanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site fill Warm and breezy Evan Lindenbach <br /> Equipment on site: <br /> 815 com actor tractor with BeGe blade 6 X 637 scrapers,water truck <br /> NOTES(Describe work completed during the day,any problems and their solutions}: <br /> - Guinn was running 6 637's removing topsoil from the clay excavation area. <br /> - Guinn was running loads of earth fill into the cell floor area. The fill was compacted with an 815 <br /> compactor and smoothed by a tractor towing a blade. <br /> - CQA was onsite for a meeting. <br /> - CQA removed two buckets of onsite clay soil from the borrow area to send to the Vector laboratory <br /> for testing. CQA also sent one bucket of subgrade material. The clay was removed from <br /> Approximately 6' - 9' below the current surface by an excavator at both the east and west sides of the <br /> borrow area. <br /> Prepared By: Reviewed By: ` IL <br /> 4/23/03,Rev.0 1 of i <br /> C-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.