Laserfiche WebLink
rurTOR <br /> INEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 1 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,CA Forward/AWT June 13,2008 Friday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn COmanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site fill Warm and breezy Evan Lindenbach <br /> Equipment on site: <br /> 815 com actor tractor with BeGe blade 6 X 637 scrapers,water truck <br /> NOTES(Describe work completed during the day,any problems and their solutions}: <br /> - Guinn was running 6 637's removing topsoil from the clay excavation area. <br /> - Guinn was running loads of earth fill into the cell floor area. The fill was compacted with an 815 <br /> compactor and smoothed by a tractor towing a blade. <br /> - CQA was onsite for a meeting. <br /> - CQA removed two buckets of onsite clay soil from the borrow area to send to the Vector laboratory <br /> for testing. CQA also sent one bucket of subgrade material. The clay was removed from <br /> Approximately 6' - 9' below the current surface by an excavator at both the east and west sides of the <br /> borrow area. <br /> Prepared By: Reviewed By: ` IL <br /> 4/23/03,Rev.0 1 of i <br /> C-2 <br />