Laserfiche WebLink
FC"TOR <br /> INEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 2 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI June 16,2008 Monda <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site fill Warm and breezy Evan Lindenbach <br /> Equipment on site: <br /> 815 com actor tractor with Bete blade 6 x 637 scra ers water truck <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn was running 5 x 637's bringing loads of earthfill into the cell floor area from the clay <br /> excavation area. The fill was compacted with an 815 compactor and smoothed by a tractor towing a <br /> blade. A water truck was used to keep moisture in the fill. <br /> - Guinn used GPS and a grade checker to monitor the grade of placed material. <br /> - Guinn is placing the material from the east side of the cell and moving to the west as they make <br /> grade. <br /> - CQA monitored placement,moisture conditioning, and compaction of the earth fill. <br /> Prepared By. Reviewed By: e, <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />