VC-7OR <br /> NGINEERING INC. <br /> DAILYSTR TI FIELD T <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 3 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,CA Forward/AWl June 18,2008 Wednesda <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan cla a soil Warm and breezy Evan Lindenbach <br /> Equipment on site: <br /> 815 com actor tractor with Bete blade 5 x 637 scrapers, 1 x 627 scra er 2 x water trucks D-6 dozer,D-6 dozer w/slo a-board <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn was cutting the south slope to grade with a D-6 and removing excess material with scrapers(4 <br /> x 637, 1 x 627). Removed material was placed in the cell as earthfill. <br /> - Guinn was cutting the northwest slope to grade with a D-6 with a slope-board and GPS control. <br /> Excess material was removed with scrapers. Removed material was placed in the cell as earth fill. <br /> - Guinn used GPS and a grade checker to monitor the grade of placed material. <br /> - Guinn is placing the material from the east side of the cell and moving to the west as they make <br /> grade. <br /> - Guinn is compacting earth fill in the cell with an 815 compactor and is moisture conditioning the <br /> material with a water truck. <br /> - CQA monitored placement, moisture conditioning, and compaction of the earth fill. <br /> Prepared By: Reviewed By: 6 <br /> 4/23/03,Rev.0 1 of i <br /> C-2 <br />