Laserfiche WebLink
Vcl"'TOR <br /> ENGINEERINC> INC. <br /> DAILYTUT1 FIELD T <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 5 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI June 20,2008 1 Friday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil Warm and breezy Evan Lindenbach <br /> Equipment on site: <br /> 815 con actor tractor with BeGe blade 5 x 637 scrapers, 1 x 627 scra er 2 x water trucks D-6 dozer D-6 dozer w/slo a-board <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn was placing subgrade fill with a D-6 with a slope-board and GPS control. <br /> - Guinn used GPS and a grade checker to monitor the grade of placed material. <br /> - Guinn is placing the earth fill material near the southwest comer of the cell. The earth fill is from <br /> both cuts within the cell and from the excavation area. <br /> - Guinn is compacting earth fill in the cell with an 815 compactor and is moisture conditioning the <br /> material with a water truck. <br /> - CQA monitored placement,moisture conditioning, and compaction of the subgrade fill and earthfill. <br /> CQA performed six(6)passing nuclear density tests on subgrade fill. <br /> Prepared By: Reviewed By: �r <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />