Laserfiche WebLink
TOR <br /> ENCINEERINQ INC. <br /> DAILY CONSTRUCTIONFIELD <br /> REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 10 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI June 30,2008 1 Monk <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil Warm and breezy Evan Lindenbach <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer w/slope-board, <br /> excavator <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn is placing subgrade fill on the north-slope with scrapers and a D-6. <br /> - Guinn is using GPS and a grade checker to monitor the grade of placed material. <br /> - Guinn is grading earth fill material in the cell. Scrapers with GPS units are being used to rough-grade <br /> the cell floor. Grading includes cutting LCRS trenches and sumps with scrapers and an excavator. <br /> - CQA monitored placement,moisture conditioning, and compaction of the subgrade fill. <br /> - CQA monitored grading of eartfill. <br /> Prepared By: Reviewed By: AKZ <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />