Laserfiche WebLink
CTOR <br /> ENGINEERING INC. <br /> DAILY CONSTRUCTION FIL T <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 11 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,CA Forward/AWI July 1,2008 Tuesda <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larryreavator Description of Fill Material: Weather: CQA Technician: <br /> light tan cla a soil Warm and breezy Evan Lindenbach <br /> on site: <br /> pactor,tractor with BeGe blade,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer w/slope-board, <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn is using GPS and a grade checker to monitor the grade of placed material. <br /> - Guinn is using a D-6 with GPS to grade the cell. <br /> - Guinn is grading earth fill material in the cell. Scrapers with GPS units are being used to rough-grade <br /> the cell floor. Grading includes cutting LCRS trenches and sumps with scrapers and an excavator. <br /> - CQA monitored grading of earthfill. <br /> • Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of i <br /> C-2 <br />