VNGINEERING INC. <br /> DAILY CONSTRUCTIONIL T <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 16 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWl July 9,2008 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> L <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil Hot and breezy Evan Lindenbach <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slo e-board,excavator,623 scra er, 140 H Moto rader <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn is using GPS and a grade checker to monitor the grade of placed material. <br /> - Guinn is ripping and wetting the excavation area with a D-6, a tractor with discs, a Motograder, and a <br /> water truck. CQA monitored moisture and composition of borrow material. <br /> - Guinn placed material from the borrow area,into the LCRS trenches within the cell. The borrow <br /> material is the material that is intended to be used for the low permeability soil layer. The material is <br /> Awk moisture conditioned to be within the spec for the low permeability layer. The material was <br /> compacted with an 815 compactor. <br /> - Guinn is pulling out of operations until permeability results from the clay test pad are completed. <br /> - CQA monitored moisture conditioning,placement, and compaction of the low permeability soil. <br /> Prepared By: Reviewed By: Wt <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />