My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_27
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:54:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IN I CTOR <br /> ENGINEERING INC. <br /> DAILY CONSTRUCTIONFIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 17 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI July 15,2008 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> L <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil Hot and breezy Evan Lindenbach <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slo e-board, excavator,623 sora er, 16 G Moto ader,825 compactor <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn is using GPS and a grade checker to monitor the grade of placed material. <br /> - Guinn is ripping and wetting the excavation area with a D-6,a tractor with discs,a Motograder, and a <br /> water truck. CQA monitored moisture and composition of borrow material. <br /> - Guinn placed low permeability soil from the borrow area,into the cell from north to south. The <br /> material was placed at a minim of 6%above optimum as per the recommendations of CQA. The <br /> material was placed i "loose lifts(6"compacted)as per the specifications. The material was <br /> compacted with an 825 compactor. <br /> - CQA discussed the permeability results from the test pad with Kevin and Larry from Guinn. CQA <br /> recommends placing the material at a minimum of 20%moisture(with optimum being 14%)with a <br /> minimum of 90%compaction(maximum density being 118 pcf). Laboratory testing of field <br /> permeability samples indicates that this combination of density and moisture should pass the <br /> permeability specifications for the project. <br /> - CQA monitored moisture conditioning,placement, and compaction of the low permeability soil. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.