Laserfiche WebLink
WMU FU-08 October 2008 <br /> Forward Landfill Project No.021605.08 <br /> 1.0 INTRODUCTION <br /> This report summarizes the construction quality assurance (CQA) observations and <br /> activities performed by Vector Engineering, Inc. (Vector) for Forward, Inc. <br /> (Forward), during the construction of WMU FU-08 at the Forward Landfill. <br /> CQA activities included monitoring earthworks construction, geosynthetics <br /> installation, and collection piping installation. This final report contains detailed <br /> documentation that the construction and CQA activities associated with the WMU <br /> FU-08 composite liner system, were constructed in accordance with approved <br /> clarifications and modifications thereto, as well as in general accordance with the <br /> following documents: <br /> 0 Title 27 of the California Code of Regulations; <br /> ® Construction Drawings, WMU FU-08, Forward Landfill, Lewis <br /> Engineering, April 2008, <br /> • Technical Specifications, WMU FU-08, Forward Landfill, Lewis <br /> Awftk� Engineering, April 2008, and <br /> 0 Construction Quality Assurance Manual WMU FU-08, Forward <br /> Landfill, Lewis Engineering, April 2008. <br /> Vector performed work on this project under authorization from Forward's project <br /> manager, Mr. Lochlin Caffey. This report was prepared for Forward by Mr. Evan <br /> Lindenbach, CQA Monitor, Mr. Aaron Lickingteller, CQA Monitor, and Mr. Monte <br /> Christie, PE, GE, Project Manager. Mr. Bryan Fritzler, PE, Company CQA <br /> manager of Vector, provided peer review of this report. <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley,CA 95945•(530)272-2448 <br /> -1- <br />