r "'TOR <br /> INEERING INC. <br /> DAILY CONSTRUCTIONFIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 27 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI July 29,2008 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil Hot and breezy Evan Lindenbach <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slo e-board,excavator,623 scraper, 16 G Motograder,825 com actor,smooth drum roller,backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn is using GPS and a grade checker to monitor the grade of placed material. <br /> - Guinn excavated the side slope anchor trench on the north-slope with a small trencher. <br /> - Guinn graded the low permeability soil with a 623 scraper,a D-6 dozer,and a 16 G Motograder all <br /> with GPS units. <br /> - Guinn rolled the low permeability soil with a smooth drum roller in areas where grade has already <br /> Allk <br /> ip been cut. <br /> CQA monitored grading of the low permeability soil. <br /> - Meeting today. <br /> 01 Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />