Laserfiche WebLink
VClITOR <br /> NGINEERING INC. <br /> DAILYTUT/ FIELDT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 28 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AW1 July 30,2008 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> L <br /> Source and Description of Fill Material: Weather: —FC—QA Technician: <br /> On-Site light tan claey soil Hot and breezy Evan Lindenbach <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slo e-board,excavator,623 scraper, 16 G Motograder,825 compactor,smooth drum roller,backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn is using GPS and a grade checker to monitor the grade of placed material. <br /> - Guinn graded the low permeability soil with a 623 scraper, a D-6 dozer, and a 16 G Motograder all <br /> with GPS units. <br /> - Guinn rolled the low permeability soil with a smooth drum roller in areas where grade has already <br /> been cut. <br /> - Guinn rolled the 2:1 area of the north-slope with a smooth drum on a cable using an excavator as an <br /> anchor and pulling the drum with a 140 H Motograder. <br /> - CQA monitored grading of the low permeability soil. <br /> Prepared By: Reviewed By: 1. <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />