Laserfiche WebLink
YIECTOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 36 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI August 9, 2008 Saturda <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Jose Ramirez <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil Warm and breezy Aaron Lickingteller <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slope-board,excavator,623 scraper, 16 G Motograder,825 compactor,smooth drum roller,backhoe, 1 forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn watered the completed low permeability soil surface with one water truck. <br /> - CQA monitored moisturizing of low permeability soil surface. <br /> - Guinn, Comanco, and CQA were onsite for a meeting to discuss specs and work schedule. <br /> - CQA cut a 3' x 14.5' sample of geo-composite to be tested at the Vector laboratory. <br /> - Received 14 rolls of single textured HDPE liner and 27 rolls of 12 oz. geotextile. <br /> - Slope liner installation that was scheduled for today failed to materialize due to mechanical failure of <br /> Comanco's forklift. All work was ceased until Monday. <br /> - Comanco filled and placed sandbags along all anchor trench areas and tie-ins. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />