My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_27
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:54:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vc"TOR <br /> NGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 37 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI August 11, 2008 Monday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> LaEy Jose Ramirez <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil Warm and breezy Aaron Lickingteller <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slo e-board,excavator,623 scra er, 16 G Motograder,825 compactor,smooth drum roller,backhoe,2 forklifts <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Comanco and Vector personnel inspected and approved the subgrade on the northwest slope prior to <br /> deploying geosynthetics. <br /> - Guinn watered the completed low permeability soil surface with one water truck. <br /> - CQA monitored moisturizing of low permeability soil surface. <br /> - Received 21 rolls of 12 oz. geotextile. <br /> - After reviewing Comanco's proposed panel deployment layout, the direction of deployment on the <br /> 5:1 of the north-western corner was questioned because it created cross seams on the slope along the <br /> entire length of each panel at approximately 15 degrees from horizontal every time a panel was <br /> deployed. The proposed layout was to be done for all layers. The Comanco superintendent,Jose <br /> Ramirez, concurred with the CQA that the present layout would maximize cross seams for this corner <br /> of the cell and was told by the Comanco project manager, Graydon Renshaw,that the method was <br /> approved verbally by the enginer, Sangeeta Lewis. After contacting the engineer and having been <br /> assured verbally by her that the proposed method of panel deployment was allowable, deployment of <br /> GCL occurred in the manner specified. All other layers are to follow the same method of placement. <br /> - 41,869 square feet of GCL was deployed on the northwest corner. The GCL was deployed in a <br /> location and in a manner that would not allow liner to be deployed without at least 50%of each panel <br /> being cut to cover the underlying GCL and would not allow continuous seaming to occur for the <br /> length of each panel and would have resulted in one portion of each panel being seamed on Monday <br /> and the other portion being seamed on the following day. Deploying in this manner would have also <br /> risked damaging the liner by folding it back and by having to drag it in the dirt during deployment, as <br /> no GCL would have existed beneath it. The GCL was covered with pieces of scrap liner found on <br /> site in a scrap pile used in deployment of liner in the previous cell and plastic sheets of visqueen. <br /> Tomorrow's areas will display an area deficiency between the GCL and HDPE areas. <br /> Prepared By: Reviewed By:RL <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />