My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_29
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:54:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_29
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_29.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2.4.4 PHASE 4 <br /> During refuse filling of Phase 3, excavation of Phase 4 will begin, and the site's <br /> main entrance and scalehouse facilities will be relocated to the Phase 5 area. <br /> Phase 4 is south of Phases 2 and 3. Activities will be conducted in the same <br /> manner as in the previous excavation. Liner and LCRS construction will occur <br /> just before Phase 3 and the existing permitted area currently occupied by the <br /> main haul road and scale facility reach waste capacity. <br /> 5.2.4.5 PHASE 5 <br /> During refuse filling of Phase 4, excavation of Phase 5 will begin. Phase 5 is the <br /> final excavation phase. The Phase 5 sequence is located south of the existing <br /> landfill and east of Phase 4. It should be noted that construction of Phase 5 as <br /> proposed includes the relocation of the South Creek, as described above. <br /> Activities will be conducted in the same manner as the previously excavated <br /> areas. Liner and LCRS construction will occur just before Phase 4 reaches its <br /> waste capacity. When completed, Phase 5 will reach the proposed final fill <br /> height within the expansion area. Figure F presents the proposed final contours <br /> for the existing permitted landfill and proposed expansion area. <br /> 5.2.4.6 PHASED CLOSURE OPERATIONS <br /> Phased closure of the landfill will be implemented throughout development of <br /> the FL. When a cell is filled to capacity and has reached final grades, it can be <br /> closed and capped with final cover. These areas will be closed in accordance <br /> with an approved Partial Final Closure Plan. Those areas which had not been <br /> closed at the end of active operation would then be closed in accordance with <br /> an approved Final Closure Plan prepared in compliance with applicable <br /> regulatory requirements in effect at that time. Currently, the lower portion of the <br /> north facing slope of the FL has been closed, as has the southern slope of <br /> WMU E (Eastern Ash Pit). A phased closure plan amendment was developed for <br /> the existing refuse footprint and and approved by the CIWMBT his plan will be <br /> modified to reflect the proposed expansion. <br /> Forward Landfill Project Description 5-6 BRYAN A.STIRRAT&ASSOCIATES <br /> (J:\Allied\Forward\2007.0018 Lateral Expansion\Reports\Prof Descrip\021308 Final Proj Des\Sec 5.doc:2/13/2008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.