My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009_11
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2009_11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 8:15:04 PM
Creation date
7/3/2020 10:54:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009_11
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2009_11.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 Estimate the retention pond volume and quantityof runoff that ma be hauled to the Stockton wastewate <br /> treatment plant. <br /> ase I. Assume the entire site is drained into the retention pond <br /> )rainage area 33.23 acres <br /> Average year net precipitation <br /> Net precipitation exceeds tits evaporation in December,January and February <br /> Net depth 5.67 inches <br /> 24-hour,25-year precipitation event <br /> Stockton WSO 1.56 inches <br /> Stockton WBAP 2.28 inches <br /> Wet season long terra storage exceeds the shortternt high intens' event and therefore controls. <br /> Retention volume required= 683,383 cu.feet <br /> 5,111,703 gallons <br /> Estimate the volume hauled during a'+Net" ear <br /> Use the maximum net from page 1. <br /> oiume of runoff for January, Februa ,,March and December 1,842,550 cu.feet <br /> 13,782,275 gallons <br /> .Less the storage volume 5,111,703 gallons <br /> Volume hauled 8,670,571 gallons <br /> Case II-Assume that runoff from Area C active composting)and D retention pond are collected. <br /> Assume that Area-A and B are uncontaminated and drain sepa to a sedimentation basin sized <br /> for the 24-hour,25-year event. <br /> - <br /> Drainage area 16.47 acres <br /> Average year net precipitation <br /> Net precipitation exceeds ibe evaporation in December,January and February <br /> Net de th 5.67 inches <br /> 24-hour,25- ear precipitaffon event <br /> Stockton WSO 1.96 inches <br /> Stockton WRAP 2.28 inches <br /> Wet season lon torm storage exceeds the short-ter high intens' event and therefore controls. <br /> Retention valume re aired= 338,705 cu.feet <br /> 2,533,547 gallons <br /> -- FN:dtr/ae1WATER AL. LS Page 2 of 5 Printed: 1/ 3:46 P <br />
The URL can be used to link to this page
Your browser does not support the video tag.