Laserfiche WebLink
Estimate the volume_hauled during a"wet"year <br /> t..: <br /> Use the maximum net from page 1. <br /> solume of runoff for January, February,March and December 913,235 cu.feet <br /> 1 6,830,998 gallons <br /> Less the store a volume 2,533,547 gallons <br /> Volume hauled 4,297,451 gallons <br /> Volume of stormwater sedimentation pond for Area A and B <br /> Area= 16.76 acres <br /> Precipitation depth= 2.28 inches <br /> Sedimentation pond volume= 138,712 cu.feet <br /> 1,037,569 gallons <br /> Total pond volume 3,571,116 gallons <br /> CCase III-=Assume the entire site is drained to retention pond sized for 24-hour,25- ear event <br /> f-- Assume all runoff collected In excess of the retention pond is hauled to the Stockton wastewater <br /> j treatment plant. <br /> Area= 33.23 acres <br /> Precipitation depth= 228 Inches <br /> ;edi en on pond volume= _ 275,025 cu.feet <br /> 2,0 ,185 gallons <br /> Volume of runoff(from Case E) 13,782,275 gallons <br /> Less the storage volume 2,057,185 lions <br /> Volume hauled 11 p725,089 Ions <br /> Summary <br /> Retention Volume <br /> Basin Hauled In <br /> Volume Wet Year <br /> (gallons gallons <br /> -. Case 1 5,111,703 8,670,571 <br /> Case 11 3,571,116 4,297,451 <br /> Case 111 2,057,185 11,725,089 <br /> FN:dtr/a:1 ATERBAL.XLS Page 3 of 5 Printed:8131/94 3:46 PM <br />