My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_11
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:35 PM
Creation date
7/3/2020 10:55:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_11
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_11.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPDENDIX A <br /> PROTOCOL <br /> St <br /> " <br /> The Sampling and Analysis Plan (MeWelder, Novenberl, 1994) describes haw Forward, Inc. <br /> conducts groundwater monitoring for A. The info 'on contained in the Plan <br /> Mpercedes sections dated to sampUng and analysis in the April 1989 Postelosurc Plan, <br /> Addendum #1 8nd Addendum #2. The 'on of gmundwater, sampUng methods and <br /> proced*es discussed in this appendix,Mcinfelder Field Activities Protocol,are an excerpt of the <br /> more compreheasivd Sampling and Analysis Plan. <br /> GR(jTJNDWATER MONITORING. <br /> Monitoring Wetly <br /> Equipment . <br /> The groundwater monitoring wells at Forward are equipped.with dedicated submerged pumps for <br /> purging' and collagdon groundwater samples." The field tachniciatr PMfoming the gmuridwater <br /> will have a <br /> - monitoring List of equipment that should be avas able with.which t0 complete the <br /> monitoring The necessary equipment is listed below This list includes actual cquipm,mt used <br /> to purge and sample the-wells in addition to personal_prdtectivc gear that srtust be worn for <br /> protection and to reduce the pbtcntial for cross co 'on of the wells and sample Soma of <br /> the aliupment used includes various iustrmctIts which <br /> require cah`bra-tion. Caln'bration <br /> procedures are discussed below.• <br /> Calibration Procedures <br /> y of the meters that arc used in the field must be cah-brated Lei produce le results. The <br /> following discusses calibration rationale,PWOCedures,and • ency for the requked instuments. <br /> WaterLevel Indicator <br /> Water Icvel indicators roast•be calibrated regularly to assure that data is not <br /> incorr=dy due to the cable stretching. To calibrate the water level iadi the cable is run out <br /> to its entire 1 and m 'mst a tape measure._ . The 0 point is the point on dle probe <br /> 'ch completes the circuit whea contacted by the water. This completed °t camses the f _ <br /> 23483849-FO A22310R325 A-t holy 14.2000 <br /> 1.�Q nxsandC��C'a w.:. • <br />
The URL can be used to link to this page
Your browser does not support the video tag.