Laserfiche WebLink
results of the QA/QC program indicate that no VOCs were detected in any of the QA/QC <br /> blanks during the monitoring period. <br /> Review of laboratory analysis dates with the required holding times indicates that all of <br /> the samples were submitted and analyzed within the required holding times during the <br /> third quarter 2010. Based on the QA/QC results, it is concluded that the laboratory data <br /> generated for the third quarter 2010 monitoring period are generally acceptable and the <br /> water quality samples collected from the Austin Unit appear to be representative of water <br /> quality at the site. <br /> 3.1.3 Groundwater Elevations and Contours <br /> Prior to purging and sampling, each well was sounded for water depth using a weighted <br /> electronic sounder, and the static water level was recorded on a well data sheet <br /> (Appendix Q. The groundwater elevations were calculated for each well by subtracting <br /> the depth-to-water measurement from the top-of-casing reference elevation. The current <br /> groundwater elevation data for the Austin Unit are summarized in Table 3-4. <br /> The groundwater elevation data obtained during this quarterly monitoring period were <br /> used to generate the groundwater elevation contour map shown on Figure 3-1, which <br /> indicates that groundwater beneath the Austin Unit generally flows to the north and east <br /> with an average hydraulic gradient of 0.002 ft/ft to the north and 0.001 ft/ft to the east. <br /> To calculate the approximate linear groundwater flow velocity for the site, conservative <br /> assumptions were used, including a hydraulic conductivity of 875 gallons per day per <br /> square foot(0.04 cm/sec) and an estimated effective porosity of 35 percent (CH2M Hill <br /> 2000). An estimated groundwater flow velocity was calculated using Darcy's Law: <br /> Ki cm 0.002 sec– ft <br /> V = — _ [(0.04 —)* 1* 2835 � 0.65 ft/day <br /> ne sec 0.35 cm – day <br /> where: V=Groundwater flow velocity. <br /> K=Hydraulic conductivity of the water-bearing unit(0.04 cm/sec). <br /> i=Hydraulic gradient: i;z�0.002 for the site during the current the third quarter 2010. <br /> ne=Effective porosity(ne=0.35);an estimated value. <br /> The groundwater flow rate is calculated to be 0.65 feet/day(237 feet/year). <br /> 3.1.4 Detection Monitoring Program <br /> Field and laboratory results for the DMP wells for the third quarter 2010 are summarized <br /> in Table 3-1 and time-series plots are presented in Appendix D. As shown in Table 3-1, a <br /> trace concentration of PCE was measured in the sample collected from well AMW-6; <br /> PCE was measured above the PQL, in the samples collected from wells AMW-13 and <br /> AMW-14; and TCE was measured above the PQL in the sample collected from well <br /> AMW-13. <br /> D:\?0 t0_00 t 3\FA_3Q t 0.doc <br /> 9 <br />