Laserfiche WebLink
Figure 1: North view of FU -10 at finish grade and ready for survey. The 320D excavator does minor detail work on the <br />southern most leachate tank sump. <br />Figure 2: North view showing the 320D excavator working in the south leachate, tank sump. The D6 w/GPS does minor <br />grading along the east limit of the module. <br />Prepared By: Michael Strobel 08/06/10 Reviewed By: <br />2 of 2 <br />C-2 <br />0 <br />0 <br />