My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:36 PM
Creation date
7/3/2020 10:55:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_21.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Equipment on site: <br />3x637 scrapers, 143H blade, D6 dozer, 815 compactor, 320D excavator, I water truck 420E backhoe, CS54 smooth drum , 4206D <br />tractor w/disc, TL943 forldift, 623 padde wheel scraper <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />1. Construction Activities <br />1. Guinn Construction used the small 320D excavator and a spotter to detail the leachate tank sumps. <br />2. Guinn Construction used the D6 to trim the west side -slope of the clay borrow, SEC from FU- 10. <br />3. Guinn Construction used the 143H blade to do minor trimming in the southeast areas of FU -10. <br />4. Guinn Construction continued moisture conditioning all Clay Liner soils on the floor areas. <br />*I. CQA Activities <br />1. CQA completed data for Atterberg Limits tests on Clay Liner samples CLS -2 and CLS -3. Both <br />sample materials were CL, "lean clayswith liquid limit/ptastic limit within speccations. <br />it CQA prepared Clay Liner interface shear material sample CLS -5 for ASTM D1557A Proctor. <br />3. CQA performed ASTM D4318 Atterberg Limits on Clay Liner Proctor sample CLS -4 and grab <br />sample CL -61. <br />[11. Conversations <br />0 With Kevin Turner, Guinn Construction, Re: Guinn off today at noon. The finish grade survey for the <br />Clay Liner is scheduled for next Tuesday, August 10, 20 10. <br />2�= <br />08/06/10 <br />1 of 2 <br />C-2 <br />Reviewed By: R6 <br />oeco- <br />I Prjt N <br />Daily Field Rqx)ft Sequence Number <br />USVC0004800 <br />I FIRM I =M VM". <br />Client Or ManW <br />Daft. <br />Day of The Week: <br />MMK got <br />Republic Services, Inc. <br />August 6, 20 10 <br />Friday <br />Lem. )OILMUI <br />Clenetal Foreman: <br />Other <br />Kevin Turner <br />Don Litchfield, Republic Services, Inc. <br />I -Weather. <br />1115061F.a M., I <br />S ILK <br />Clear, It. breeze, 50's -90's OF <br />17 rM 17 MIRP <br />ou <br />Equipment on site: <br />3x637 scrapers, 143H blade, D6 dozer, 815 compactor, 320D excavator, I water truck 420E backhoe, CS54 smooth drum , 4206D <br />tractor w/disc, TL943 forldift, 623 padde wheel scraper <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />1. Construction Activities <br />1. Guinn Construction used the small 320D excavator and a spotter to detail the leachate tank sumps. <br />2. Guinn Construction used the D6 to trim the west side -slope of the clay borrow, SEC from FU- 10. <br />3. Guinn Construction used the 143H blade to do minor trimming in the southeast areas of FU -10. <br />4. Guinn Construction continued moisture conditioning all Clay Liner soils on the floor areas. <br />*I. CQA Activities <br />1. CQA completed data for Atterberg Limits tests on Clay Liner samples CLS -2 and CLS -3. Both <br />sample materials were CL, "lean clayswith liquid limit/ptastic limit within speccations. <br />it CQA prepared Clay Liner interface shear material sample CLS -5 for ASTM D1557A Proctor. <br />3. CQA performed ASTM D4318 Atterberg Limits on Clay Liner Proctor sample CLS -4 and grab <br />sample CL -61. <br />[11. Conversations <br />0 With Kevin Turner, Guinn Construction, Re: Guinn off today at noon. The finish grade survey for the <br />Clay Liner is scheduled for next Tuesday, August 10, 20 10. <br />2�= <br />08/06/10 <br />1 of 2 <br />C-2 <br />Reviewed By: R6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.