Laserfiche WebLink
Ausenco <br />e Vector <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward VVMU FU -10 <br />USVC0004800 <br />033 <br />IMMMIrn, 307171 <br />Date: <br />Day of The We& <br />3,2010 <br />Friday <br />C Contractor <br />Project Engineer: <br />Guinn Construction <br />Monte Christie <br />Genersl Foreman: <br />Kevin Turner <br />W <br />Source and Description of Fill Material: <br />11 <br />CQA Technician: <br />Native silty clays in SEC processing <br />area <br />Clear, It. breeze, 50's-80's'OF <br />Michael Strobel .,, <br />Equipment on site: <br />3x637 scrapers, D6 dozer, 320D excavator, I water truck, 420E backhoe, 4206D ft-dctor w/disc, TL943 forklift, 623 paddle wheel <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />I. Construction Activities <br />1. Guinn Construction continued moisture conditioning all Clay Liner soils on the floor areas. <br />II. CQA Activities <br />0 1. CQA completed misc. data entry for soils testing. <br />2. CQA reviewed all specifications and CQA procedures for +g f1 <br />III. Conversations <br />0 None listed. <br />08/13/10 <br />1 of I <br />C-2 <br />119-Mr-TIMN <br />