My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:36 PM
Creation date
7/3/2020 10:55:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_21.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ausenco <br />9 Vector <br />►, role] I &i I N <br />ConstructionNOTES (Describe work completed during the day, any problems and their solutions) <br />1. <br />I . Guinn Construction continued moisture conditioning all Clay Liner soils on the floor areas. <br />2. COMANCO arrived site: start filling sandbags, set up field trailer. They also held a pre-vroiect safety <br />meeting; discussed awareness of landfill traffic. Ruben Ramirez w/Forward said they would reroute <br />traffic from 1ng the east side / i to the upperdeck1FU-08. <br />3. A load or LCRS gravel was delivered for sandbag material. <br />4. Fourteen (14) rolls of geogrid were delivered to site; CQA has the paper work. <br />11. A Activities <br />1. Q • monitored <br />2. • reviewed liner installationspecifications l 1 Clayton Lung 0 <br />111. Conversations <br />With Monte f 1 Discussion f g w/COMANCO that a lot <br />rollsthe of GCL have no labels and 1 lengths. Montestressed no crossf 1 p; <br />and to do the best adjusting 1 " panels is ` 1 meet ; :c 1 t requirements. Also brought this t: <br />the attention of Don Litchfield w/Republic Services; Doan is also aware of the missing information <br />1, the GCL. CQA has been instructed to collect samplesof 1 1 numbers, <br />to a panel number and save these samples for additional testing as needed. <br />Prepared By: Michael <br />08/16/10 <br />1 of 2 <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.