Laserfiche WebLink
Ausenco <br />9 Vector <br />►, role] I &i I N <br />ConstructionNOTES (Describe work completed during the day, any problems and their solutions) <br />1. <br />I . Guinn Construction continued moisture conditioning all Clay Liner soils on the floor areas. <br />2. COMANCO arrived site: start filling sandbags, set up field trailer. They also held a pre-vroiect safety <br />meeting; discussed awareness of landfill traffic. Ruben Ramirez w/Forward said they would reroute <br />traffic from 1ng the east side / i to the upperdeck1FU-08. <br />3. A load or LCRS gravel was delivered for sandbag material. <br />4. Fourteen (14) rolls of geogrid were delivered to site; CQA has the paper work. <br />11. A Activities <br />1. Q • monitored <br />2. • reviewed liner installationspecifications l 1 Clayton Lung 0 <br />111. Conversations <br />With Monte f 1 Discussion f g w/COMANCO that a lot <br />rollsthe of GCL have no labels and 1 lengths. Montestressed no crossf 1 p; <br />and to do the best adjusting 1 " panels is ` 1 meet ; :c 1 t requirements. Also brought this t: <br />the attention of Don Litchfield w/Republic Services; Doan is also aware of the missing information <br />1, the GCL. CQA has been instructed to collect samplesof 1 1 numbers, <br />to a panel number and save these samples for additional testing as needed. <br />Prepared By: Michael <br />08/16/10 <br />1 of 2 <br />W <br />