Laserfiche WebLink
Ausenco <br />Vector <br />ProjectName: ;I <br />nl'�i <br />Project No. <br />Daily Field Rq3ort Sequence Number: <br />Forward WMU FU -10 <br />USVC0004800 <br />039 <br />Location of Work: <br />Date: <br />Day of ne We&: <br />Stockton, CA <br />a I <br />August 21, 20 10 1 <br />Saturday <br />cmwral contractm. <br />Linerconuactor <br />Project Engineer: <br />Guinn Construction <br />COMANCO <br />Monte Christie <br />General 1�branan: <br />Liver Superintendent: <br />Kevin Turner <br />Jose Hernandez <br />Don Litchfield, Republic Services, Inc. <br />Source and Description of Fifft —NUterial: <br />Weadw <br />CQA Technician: <br />Native silty clays in SEC processi Lag area <br />Clear, It. breeze, 50's-92 OF <br />Michael Strobel <br />Equipment on site: <br />I <br />3x637 =Mrs, D6 dozer, I water truck, 420E backhoe, TL943 forklift, L <br />623 aLffle wheel =mr <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />I. Construction Activities <br />1. Guinn Construction continued moisture conditioning all Clay Liner soils on the floor areas. <br />2. COMANCO continued deployment of the double -side textured 60 mil HDPE liner on the floor. <br />Panels deployed today: P-4 through P- 13; about 91,922 fl� today; about 119,546 ft2 to date. <br />3. COMANCO completed all repairs to the single -side textured 60 mil HDPE liner on the slope areas of <br />FU -10. <br />II. CQA Activities <br />I . CQA monitored all construction activities, including: trial welds, as -built field maps, deployment, <br />seaming/pressure testing, subgrade acceptance and repairs. <br />2. CQA marked out floor area HDPE liner Destructive Samples DS -1, 2 and 3. They will be removed on <br />Monday, August 23, 20 10 and shipped to Precision Labs in Anaheim for peel and shear tests. <br />3. CQA and COMANCO completed the Subgrade Acceptance for Friday's deployment of HDPE panels <br />P- I through P-3 on the floor area; about 27,624 ft2 (full roll dimensions excluding trimmed comers). <br />4. CQA received email information from Precision Labs indicating passing results on slope liner <br />Destructive Samples DS- 1, 2 and 3. <br />III. Conversations <br />0 None listed. <br />Prepared By: Michael <br />08/21/10 <br />1 of 2 <br />NN <br />Reviewed By: <br />