Laserfiche WebLink
Figure 1: North view: Starting deployment of the douhle-side textured 60 mil HDPE: panels P-1, 2 and 3, in the NWC of <br />the FU -10 floor. <br />Figure 2: Northwesterly view of COMANCO technician cleaning ahead of a wedge welder in the seam overlap along the <br />tie-in to FU -08 <br />Prepared By: Michael Strobel Reviewed By: <br />08/20/10 <br />2 of 2 <br />C-2 <br />• <br />