Laserfiche WebLink
1 1 v r �,rrtUITM '%' e. �S u` �a r or <br />1. Construction Activities <br />1. ! continued repairs,seam and pressure testing on double-sidetexha-edr) mil HDPE <br />liner on the south floor areas of FU- 10. Note: Panels deployed on Wednesday, August 24, 20 10, wer--. <br />reported ' through P-26, approximately It 7►tar incorrect panels deployed t <br />P-33, for r r.ily deployment of ► r total to date of r ► 11; <br />01. <br />iy Activities <br />1. QA monitored , qtr, .► ► r activities, including trial welds,r # maps, rin+ and <br />pressure testing, subgrade acceptance and repairs. <br />2. CQA located, marked -out, and shipped, via USPS,y ► destructive rr ► - ♦, <br />through DS -30, to the Precision Geosynthetic Laboratories in Anaheim, CA, for peel and shear tests. <br />3. 4 <br />�;i s continued .'r 1 r' RepairLog; numbering "repairs)r ► ,.* # as <br />111. Conversations <br />With Don Litchfield,Hernandez O <br />low r1 weldingfr Several calls were made r>expedite11 needed- edRubenr, had extra <br />welding ',r in storage and the <br />concern was nullified. <br />= <br />NIN <br />