Laserfiche WebLink
Project Naine: <br />a," MMM V <br />0 <br />orward W��.t <br />AJJ,*tTL'%JTFT <br />Locafion Of Wo& <br />I M, I ".,*I rM, <br />bawof <br />The WeeL <br />Stockton, CA <br />August 26, 20 10 i�' <br />Thursda <br />y <br />Unercon(racmr. <br />Project BVinew. <br />v I <br />t COMANCO <br />Monte Christie <br />rMMM"'s ,, 10" <br />or" .27,01, �Mll <br />offier <br />0. 14RNZ ro N 4 1 F 1 4 <br />Don Litchfield, Republic Services, Inc. <br />source and 6-s-c� of Fill MAaW: <br />I' Native silty clays in IS _processingama_ <br />Clear, It breeze, 60's- 100 OF <br />I � <br />Equ4)ment on site: <br />U637 scrapers, D6 dozer, I water Uwk, 420E backhoe, TL943 forklift, 623 paxictle wheel scraper <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />I. Construction Activities <br />1. COMANCO continued and completed deployment of the double -side textured 60 mil HDPE on the <br />floor and in the sumps for WMU FU- 10. Panels deployed today: P-34 through P-57, approximately <br />25,230 fe* Total on the floor areas to date: approximately 267,298 if <br />2. COMANCO continued work continues on repairs. <br />01. CQA Activities <br />monitored all construction activities, including trial welds, as -built field maps, warning and <br />pressure testing, subgade acceptance and repairs - <br />2. <br />QA .#• located, marked -out, collected and shipped, via USPS, floor liner destructive samples DS -31 <br />through DS -34 to the Precision Geosynthetic Laboratories in Anaheim, CA, for peel and shear tests. <br />3. CQA continued entries in the Repair Log; numbering repairs R-87 through R-105. <br />4. CQA received information from Precision Geosynthetic Laboratories that liner destructive samples <br />DS -9 through DS- 18 passed. To date, all liner destructive samples have passed specification <br />requirement -s- <br />111. Conversations <br />0 None listed. <br />NN <br />