Laserfiche WebLink
9 1 11 Alb� <br />I�ft <br />SM <br />NOTES (Describe work compktad during the day, any problems and tbeir solutions) <br />1. Construction Activities <br />1. COMANCO continued repairs in the sumps and various locations on the floor areas. <br />2. COMANCO removed the sand bags and leveled the ballast on the GCL and single -side textured <br />HDPE in the 5:1 slope anchor trench. <br />QA Activities I <br />1. CQA monitored all constniction activities, including trial welds, as -built field maps seaming and <br />pressure testing, subgrade acceptance and repairs. <br />2. CQA received information from Precision Geosynthetic Laboratories that destructive samples DS - <br />through D2-34 passed. <br />3. CQA continued entries in the Repair Log; numbering repairs R- 106 through R- 150. <br />111. Conversations <br />* None listed. <br />277,7.2= «»m» «:� 2 <br />09/27/10 <br />1 Of I <br />NN <br />