Laserfiche WebLink
Figure 1: North view of WMU FU -10 showing completed deployment of the 60 mil HDPE floor liner system; lining in the <br />sumps was completed this afternoon. <br />Figure 2: Detail of typical CQA documentation of a repair: This is R-105; a "T" at a 3 -panel intersection. <br />The green dots are CQA sign -off; they indicate that CQA has the welding and the passing vacuum testing information <br />recorded in the as -built Geld maps. <br />• <br />• <br />Prepared By: Michael Strobel Reviewed By: <br />08/26/10• <br />2 of 2 <br />C-2 <br />