contents were within acceptable range of the nuclear gauge moisture contents. A total of twelve (12) <br />moisture contents (ASTM D-2216) were performed at the specified frequency of 1 per 1,613 cy, <br />which satisfies the minimum test frequency of 1 test per every 2,500 cy of material placed. Areas that <br />failed to meet the acceptable compaction and moisture content were reworked and retested until a <br />passing result was achieved. Summaries of the field nuclear method moisture -density testing are <br />included in Appendix D. <br />Density Verification: To verify the accuracy of the in situ soil densities determined by the nuclear <br />gauge, sand cone tests were performed in conjunction with the nuclear gauge tests. The wet density <br />values obtained by the sand cone test were compared to the nuclear gauge results. Four (4) sand <br />cone tests were performed in the compacted low permeable Clay Liner (CL) soils at a frequency on 1 <br />test per 5,000 cy, which satisfies the minimum specified frequency of 1 sand cone test per 5,000 cy. <br />Results of the Sand Cone density tests are included in Appendix D. <br />Hydraulic Conductivity: Eight (8) in situ soil samples were collected during placement and <br />compaction of the low permeable Clay Liner (CL) soils and tested for permeability in the Ausenco <br />Vector Grass Valley laboratory. Falling head, rising tail water tests were performed in the laboratory <br />according to the procedures outlined in ASTM D-5084. The permeability of the samples met the <br />specified value of 3.1 x10"8 cm/s or lower. Results of the laboratory permeability tests of the low <br />permeable Clay Liner (CL) are presented in Appendix D. Table 5 presents a summary of the low <br />permeable Clay Liner (CL) permeability tests. <br />When placement of the low permeable Clay Liner (CL) soils reached the required thickness and <br />elevations, the surface of the compacted low permeable Clay Liner (CL) was fine graded by a 140H <br />blade w/GPS and finished with several passes by a vibratory smooth drum roller. The Ausenco <br />Vector CQA monitor observed the smooth drum rolling procedure and made recommendations to the <br />Contractor regarding rough areas where ridges or depressions were present; these areas were <br />reworked by the smooth drum roller until a smooth, even surface condition was evident. The surface <br />of the compacted Clay Liner (CL) was also monitored for potential desiccation cracking. Suspect <br />areas were lightly moisture conditioned and reworked by the smooth drum roller. When the Clay <br />Liner (CL) surface preparation was complete, the area was reinspected by the Ausenco Vector CQA <br />monitor and the liner installer; if acceptable, the area was approved for geomembrane placement. <br />Subgrade Acceptance forms for the area to be covered by geosynthetics were filled out and <br />exchanged between the Ausenco Vector CQA monitor and the installer. The Subgrade Acceptance <br />forms are presented in Appendix E. <br />Survey verification of all lines and grades was performed by RJA & Associates and reviewed by the <br />Ausenco Vectors CQA Officer prior to geosynthetics deployment. <br />Date: October 2010 <br />USVC0004800 <br />Final Construction Quality Assurance Report t t <br />