My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:36 PM
Creation date
7/3/2020 10:55:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_21.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
contents were within acceptable range of the nuclear gauge moisture contents. A total of twelve (12) <br />moisture contents (ASTM D-2216) were performed at the specified frequency of 1 per 1,613 cy, <br />which satisfies the minimum test frequency of 1 test per every 2,500 cy of material placed. Areas that <br />failed to meet the acceptable compaction and moisture content were reworked and retested until a <br />passing result was achieved. Summaries of the field nuclear method moisture -density testing are <br />included in Appendix D. <br />Density Verification: To verify the accuracy of the in situ soil densities determined by the nuclear <br />gauge, sand cone tests were performed in conjunction with the nuclear gauge tests. The wet density <br />values obtained by the sand cone test were compared to the nuclear gauge results. Four (4) sand <br />cone tests were performed in the compacted low permeable Clay Liner (CL) soils at a frequency on 1 <br />test per 5,000 cy, which satisfies the minimum specified frequency of 1 sand cone test per 5,000 cy. <br />Results of the Sand Cone density tests are included in Appendix D. <br />Hydraulic Conductivity: Eight (8) in situ soil samples were collected during placement and <br />compaction of the low permeable Clay Liner (CL) soils and tested for permeability in the Ausenco <br />Vector Grass Valley laboratory. Falling head, rising tail water tests were performed in the laboratory <br />according to the procedures outlined in ASTM D-5084. The permeability of the samples met the <br />specified value of 3.1 x10"8 cm/s or lower. Results of the laboratory permeability tests of the low <br />permeable Clay Liner (CL) are presented in Appendix D. Table 5 presents a summary of the low <br />permeable Clay Liner (CL) permeability tests. <br />When placement of the low permeable Clay Liner (CL) soils reached the required thickness and <br />elevations, the surface of the compacted low permeable Clay Liner (CL) was fine graded by a 140H <br />blade w/GPS and finished with several passes by a vibratory smooth drum roller. The Ausenco <br />Vector CQA monitor observed the smooth drum rolling procedure and made recommendations to the <br />Contractor regarding rough areas where ridges or depressions were present; these areas were <br />reworked by the smooth drum roller until a smooth, even surface condition was evident. The surface <br />of the compacted Clay Liner (CL) was also monitored for potential desiccation cracking. Suspect <br />areas were lightly moisture conditioned and reworked by the smooth drum roller. When the Clay <br />Liner (CL) surface preparation was complete, the area was reinspected by the Ausenco Vector CQA <br />monitor and the liner installer; if acceptable, the area was approved for geomembrane placement. <br />Subgrade Acceptance forms for the area to be covered by geosynthetics were filled out and <br />exchanged between the Ausenco Vector CQA monitor and the installer. The Subgrade Acceptance <br />forms are presented in Appendix E. <br />Survey verification of all lines and grades was performed by RJA & Associates and reviewed by the <br />Ausenco Vectors CQA Officer prior to geosynthetics deployment. <br />Date: October 2010 <br />USVC0004800 <br />Final Construction Quality Assurance Report t t <br />
The URL can be used to link to this page
Your browser does not support the video tag.