My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:36 PM
Creation date
7/3/2020 10:55:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_21.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />The deployment methods and documentation of the DST and the SST HDPE liners were the same. <br />Therefore, Ausenco Vector CQA documentation procedures and testing described below pertains to <br />both material types. <br />5.3.1.1 Receiving Inspection <br />Upon arrival by truck shipment, the Ausenco Vector CQA monitor observed the unloading and <br />storage of the geomembrane rolls. As each roll was unloaded from the delivery truck the roll number <br />was recorded in the Receiving Logs, and then crosschecked with the manufacture's quality control <br />documents (MQC Certifications) provided by the liner manufacturer. These documents were <br />reviewed by the Ausenco Vector Engineer of Record. Following this review the material was <br />approved for deployment. A copy of the Receiving Logs and MQC certificates are included in <br />Appendix I. <br />5.3.1.2 CQA Conformance Testing <br />Select samples of the HDPE were cut from random rolls of the geomembrane at the manufacturing <br />plant by the third party testing laboratory for conformance testing in accordance with the project <br />specifications and CQA manual. Conformance testing included: <br />• density (ASTM D-1505); <br />• carbon black content (ASTM D-4218); <br />• carbon black dispersion (ASTM D-5596); <br />• thickness (ASTM D-5994); <br />• tensile properties (ASTM D-6693); <br />• asperity height (GRI GM -12); and <br />• interface shear strength testing. <br />A total of six (6) 60 -mil thick HDPE geomembrane samples were tested for conformance. The six <br />samples consist of four (4) for the double -sided geomembrane and two (2) for the single sided <br />geomembrane. Based on 433,620 ft2 of HDPE received, this testing frequency corresponds to one <br />test per 72,270 ft2 which satisfies the requirement of one test per 100,000 ft2. Results of the <br />conformance testing indicated that the materials met the requirements of the project specifications. <br />In addition, large-scale direct shear testing was conducted on the clay/geomembrane and <br />geomembrane/geotextile interfaces (the GCL interface shear testing is discussed in Section 5.1). <br />Results of the conformance testing indicated that the materials met the requirements of the project <br />specifications. A summary of the conformance test results is included in Table 8. Detailed test <br />results including the geomembrane/geotextile interface shear tests are included in Appendix I. <br />5.3.2 Geomembrane Installation <br />5.3.2.1 Geomembrane Deployment <br />Surface Preparation: Prior to installation of the HDPE, Vectors CQA Monitor inspected that the <br />GCL has been installed as specified by the project specifications and there was no change in surface <br />condition that required repair work <br />Layout Drawing: The liner contractor, COMANCO, submitted a proposed panel layout drawing that <br />showed the general panel configurations and dimensions. These drawings were reviewed and <br />Date: October 2010 <br />USVC0004800 <br />Final Construction Quality Assurance Report 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.