My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:36 PM
Creation date
7/3/2020 10:55:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_21.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AusencA <br />Vector <br />4p <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward WMU FU -10 <br />USVC0004800 <br />001 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton, CA <br />Republic Services, Inc. <br />June 28, 2010 <br />Monday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Kevin Turner <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Native silty -sandy clays SE from cell <br />Clear, breezy NW, 700-1000 F <br />Michael Strobel <br />Equipment on site: <br />5x637 scrapers, 143H blade, D6 dozer, 815 compactor, 321C excavator, 3 water trucks <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />I. Construction Activities <br />1. Guinn Construction has completed stripping and rough grading within the project areas. <br />2. Guinn Construction started and completed removal of the existing south berm on FU -09. <br />3. Guinn Construction started placement of the Subgrade Fill soils on the north end of Cell FU -10 for <br />the 5:1 slope. The D6 widened the lower bench for access and "keys" into the existing soil cover <br />during placement. By mid-morning four 637 scrapers were placing 8" loose lifts on the bench. Each <br />lift is moisture conditioned by a water truck and compaction is achieved by the 815 sheepsfoot. <br />4. Guinn Construction started moisture conditioning the floor area Subgrade soils and controlling dust as <br />needed. <br />II. CQA Activities <br />1. CQA on site at 0700 hours; checked in with office staff; met with the contractor. <br />III. Conversations <br />• With Ruben Ramirez, Landfill Operations Manager, Re: CQA on site. Discussed location of site <br />trailer, etc. <br />• With Kevin Turner, Guinn Construction, Re: CQA introduction, etc. <br />• With Monte Christie and Bryan Fritzler, AusencoVector, Re: Current activities, etc. The trailer will <br />be delivered either tomorrow or Wednesday, June 30, 2010. CQA will come to the Grass Valley <br />office tomorrow to meet with Monte for a set of the plans and specifications and collect the soils <br />testing equipment. <br />Prepared By: Michael Strobel <br />06/28/10 <br />1ofl <br />W <br />Reviewed By: A6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.