AusencA <br />Vector <br />4p <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward WMU FU -10 <br />USVC0004800 <br />001 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton, CA <br />Republic Services, Inc. <br />June 28, 2010 <br />Monday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Kevin Turner <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Native silty -sandy clays SE from cell <br />Clear, breezy NW, 700-1000 F <br />Michael Strobel <br />Equipment on site: <br />5x637 scrapers, 143H blade, D6 dozer, 815 compactor, 321C excavator, 3 water trucks <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />I. Construction Activities <br />1. Guinn Construction has completed stripping and rough grading within the project areas. <br />2. Guinn Construction started and completed removal of the existing south berm on FU -09. <br />3. Guinn Construction started placement of the Subgrade Fill soils on the north end of Cell FU -10 for <br />the 5:1 slope. The D6 widened the lower bench for access and "keys" into the existing soil cover <br />during placement. By mid-morning four 637 scrapers were placing 8" loose lifts on the bench. Each <br />lift is moisture conditioned by a water truck and compaction is achieved by the 815 sheepsfoot. <br />4. Guinn Construction started moisture conditioning the floor area Subgrade soils and controlling dust as <br />needed. <br />II. CQA Activities <br />1. CQA on site at 0700 hours; checked in with office staff; met with the contractor. <br />III. Conversations <br />• With Ruben Ramirez, Landfill Operations Manager, Re: CQA on site. Discussed location of site <br />trailer, etc. <br />• With Kevin Turner, Guinn Construction, Re: CQA introduction, etc. <br />• With Monte Christie and Bryan Fritzler, AusencoVector, Re: Current activities, etc. The trailer will <br />be delivered either tomorrow or Wednesday, June 30, 2010. CQA will come to the Grass Valley <br />office tomorrow to meet with Monte for a set of the plans and specifications and collect the soils <br />testing equipment. <br />Prepared By: Michael Strobel <br />06/28/10 <br />1ofl <br />W <br />Reviewed By: A6 <br />