Ausenco <br />Vector <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward WMU FU -10 <br />USVC0004800 <br />002 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton, CA <br />Republic Services, Inc. <br />June 29, 2010 <br />1 Tuesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Kevin Turner <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Native silty -sandy clays, E side of cell <br />Clear, breezy NW, 700-1000 F <br />IMichaelStrobel <br />Equipment on site: <br />5x637 scrapers, 143H blade, D6 dozer, 815 compactor, 321C excavator, 3 water trucks <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />I. Construction Activities <br />1. Guinn Construction continued placement of the Subgrade Fill soils on the north end of Cell FU -10 <br />for the 5:1 slope. Four 637 scrapers place a horizontal fill in 8" loose lifts on the slope. Each lift is <br />moisture conditioned by a water truck and compaction is achieved by the 815 sheepsfoot. The D6 <br />continued rough finish grading in the mid -slope areas. The contractor estimates about 9,000cy have <br />been placed on the slope to date. <br />2. Guinn Construction continued moisture conditioning the floor area subgrade soils and controlling <br />road -dust as needed. <br />11. Activities <br />1. • . in Grass Valley office at 08 00 hours forplans, specificationsand soils testingequipment. <br />2. CQA on project site at 1245 h• • monitored activities as needed. <br />3. The trailer was delivered this afternoon and the soils tab off-loaded from vehicle. <br />III. Conversations <br />50FTIFIrmoml <br />Prepared By: Michael <br />06/29/10 <br />loft <br />NN <br />Reviewed By: <br />