My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:36 PM
Creation date
7/3/2020 10:55:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_21.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AusencoVector <br />107-, TIVIOICTiftWolrMI _ .t. <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number - <br />Forward VRVIU FU -10 <br />USVC0004800 <br />010 <br />Location of Wo& <br />clientormaaw <br />Day of The Week: <br />Stockton, CA <br />__Republic Services, Inc. <br />Tuesday <br />General Contractor: <br />Project Engineer: <br />Ili <br />. _ +:� •". <br />t_� t. ,t <br />other: <br />Litchf <br />leld, ubtic Services, Inc. <br />SourceDon <br />and Description of ,r.h{ <br />Weather.�r <br />Native silty -sandy clays, E&S side of cell <br />Michael Strobel <br />Equipment on site: <br />5x637 sc rs, 143H blade, D6 dozer, 815 r, 32tC excavator, 3 water bucks <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />I. Construction <br />Guinn`t 1 f 1 continued 1 L f f •. Subgrade Fill soilsfrom :C 1 1. alongside <br />east of the east termination for FU -10.f /; move 1 1 the SWC of the future <br />expansion 1 {. The 815 compactor rew1 t the entire floor <br />2. Guinn Construction continued using the D6 dozer with slope wings to #I slope below <br />AM bench ;1 1 " north end 1 {. Scrapers carry the trimmings1 the " t: / _. <br />waterMr expansion area. The fmoistureconditioning t y tentireproject area, <br />as well as controlling roadway dust as needed. <br />3. Guinn Construction us1 the 32 1 C excavatorand a spottero do minor detailwork at the south end of <br />the tie-in 1 {' <br />o- <br />• 1 Activities <br />•' completed ASTM D422 sieve analysis on Subgrade Fill sample <br />2. CQA completed ASTM D422 sieve analysis on Granular Drainage Material sample GD- 1; the <br />size of 1.terial was well within specification requirements. <br />3. •` moisture conditioned Subgrade Fill sample for ASTM D1557A Proctor compaction. <br />4. •' collected, dried ba1 prepared Subgrade Fill sample• for ASTM D1557A Proctor. <br />5. ,• performed 1nuclear method moisture -density Subgrade Fill at rough <br />grade on 1'floor areaof ! 4through { including t + a!mois <br />samplelocation indicated passing <br />11IM-7 7-4 k_3 NI I 11 ITT M 0 6 35 L419 i M9,115011KI HLIJUIRM., <br />. I - <br />07/13/10 <br />1 of 2 <br />1W <br />
The URL can be used to link to this page
Your browser does not support the video tag.