Laserfiche WebLink
Figure 1: North view of the 321C excavator continues detail work along the tie-in along the east side of WMU FU -08. <br />Figure 2: North view of the geosynthetic stockpile area. Lett of center are 35 rolls of `new' double -sided 60mil HDPE. <br />Right side of center: materials left over from FU -09; about 15 rolls of single -sided geocomposite (right foreground) in <br />front of 64 rolls of CCL ruder a tarp. <br />• <br />• <br />Prepared By: Michael Strobel Reviewed By: W.e, <br />07/l3/10 • <br />2 of 2 <br />C-2 <br />