Laserfiche WebLink
Ausenco <br /> Vector <br /> aSIGNATURE PAGE <br /> Ausenco Vector provided construction quality assurance services during the construction of WMU <br /> FU-10, at the Forward Landfill. The following final construction certification report was prepared by <br /> Vector and is hereby submitted to the Regional Water Quality Control Board (RWQCB). <br /> This report was prepared in accordance with generally accepted geotechnical and geosynthetic <br /> engineering practices applicable at the time the report was prepared. Ausenco Vector makes no <br /> other warranties, either expressed or implied, as to the professional advice provided under the terms <br /> of this agreement, and as described in this report. Our recommendations consist of professional <br /> opinions and conclusions based on our testing and inspection program performed during <br /> construction. <br /> The purpose of this report is to inform the RWQCB that, in our professional opinion, the WMU FU-10 <br /> liner system at the Forward Landfill has been constructed and completed in general accordance with <br /> the project plans and specifications. During the construction, Ausenco Vector conducted <br /> observations and testing to determine that the construction was conducted in general accordance <br /> with the project plans and specifications. The conclusions of our observations and testing, together <br /> with a written narrative describing the personnel, scope, methods, procedures and results of our CQA <br /> services, have been included in this certification report. <br /> JdJ' ' Ir - -- <br /> Monte A. Christie, PE, GE <br /> No C58866 NO.C58866 <br /> CQA Engineer ¢o GE2 <br /> OF C <br /> Date:October 2010 <br /> USVC0004800 <br /> Final Construction Quality Assurance Report 1 <br />