Ausenco <br /> Vector <br /> 0 Prepared Subgrade Fill (SF)soils. <br /> 2:1 SIDESLOPE <br /> ® 1-foot thick protective Operations Layer soils(to be placed 10 feet vertically up the slope, the <br /> remaining material will be placed during operations); <br /> • Geocomposite drainage material; <br /> ® 60-mil thick single-side textured HDPE geomembrane; <br /> ® Geosynthetic clay liner(GCL); and <br /> Prepared Subgrade Fill (SF)soils. <br /> :9 SID S OP <br /> 1-foot thick protective Operations Layer soils(to be placed during operations); <br /> ® Geocomposite drainage material; <br /> ® 60-mil thick single-side textured HDPE geomembrane; <br /> ® Geosynthetic clay liner(GCL); and <br /> • Approximately 5 feet of engineered Subgrade Fill (SF) soils placed over the existing Austin Road <br /> Landfill. <br /> 2.2 Project Construction Summary <br /> Earthwork construction on the 5:1 slope, bench, and 2:1 slope areas of WMU FU-10 started the first <br /> week of July, 2010, and was essentially completed by July 16, 2010. Geosynthetics deployment on <br /> the 5:1 slope, bench, and 2:1 slope areas was started on August 17, 2010 with the deployment of <br /> GCL and 60-mil single-side textured HDPE liner; and was completed on August 19, 2010. <br /> Deployment of the Geocomposite on the slope areas started on August 28, 2010 and was completed <br /> on August 31, 2010. Placement of the Operations Layer soils began on September 8, 2010 and was <br /> completed on September 23, 2010. The second leak test on the floor area on top of the operations <br /> layer was performed on September 23-24, 2010. The 3 leachate collection tanks and piping system <br /> were installed on September 28, 2010. <br /> Date:October 2010 <br /> USV00004800 <br /> Final Construction Quality Assurance Report 3 <br />