Laserfiche WebLink
F� <br /> • Ready for automatic start(to Master control) 1 NO <br /> • Operation (engine runs) 1 NO <br /> • Collective signal "shut down" 1 NC <br /> • Collective signal "warning" 1 NC <br /> External (by others) provided command/status signals: <br /> • Engine demand (from Master control) 1 NO <br /> Single synchronizing Automatic <br /> With voltage balance <br /> For automatic synchronizing of the module with the generator circuit breaker to the grid by PLC-technology, <br /> integrated within the module control panel. <br /> Consisting of: <br /> • Lockable synchronizing mode selector switch, with positions"MANUAL-OFF -AUTOMATIC" <br /> • AUTOMATIC: <br /> Automatic module synchronization, after synchronizing release from the control panel <br /> • MANUAL: <br /> Manual initiation of synchronizing by push button. Speed adjustment and closing of the circuit breaker is <br /> automatically controlled via microprocessor <br /> • OFF: <br /> Synchronization is disabled <br /> • Additional PLC hardware for the fully automatic synchronizing of each module, and monitoring of the <br /> "CIRCUIT BREAKER CLOSED" signal. <br /> Logic for monitoring of: <br /> • Non-logic breaker positions <br /> • Switch "ON" trouble <br /> • Switch "OFF"trouble <br /> • Automatic synchronizing device to control the electronic speed governor adjustment, double voltmeter, <br /> double frequency meter and synchronoscope <br /> • Automatic voltage balancing <br /> • Luminous push button "GENERATOR CIRCUIT BREAKER OPEN/SELECT' <br /> • To indicate synchronizing mode <br /> • To indicate"Generator circuit breaker closed" <br /> • For manual synchronizing selection with the synchronizing mode selector switch in the MANUAL position <br /> • For manual closing of the generator circuit breaker to the voltage free bus bar(first connection)with <br /> synchronizing mode selector switch in the MANUAL position <br /> • Luminous push button "GENERATOR CIRCUIT BREAKER OPEN' <br /> • To indicate"Generator circuit breaker open" <br /> • To manually open the generator circuit breaker <br /> • Control switch <br /> • Required relays for control and monitoring <br /> • Voltage relay for monitoring of bussbar voltage (only for island operation) <br /> Operational indications for: <br /> • Generator circuit breaker CLOSED <br /> 19.04.2011/2 TS JGS616 E22 4160V April 192011 Ameresco Forward LFG-WES <br /> 23132 <br />