� <br /> 4`,Q Surf"up and commissioning <br /> Start=upliand commissioning with the GE Jenbacher start-up and commissioning checklist must be ordered <br /> separately. <br /> 4.06 Trial run <br /> After start-up and commissioning, the plant will be tested in an 8-hour trial run. The operating personnel will <br /> be introduced simultaneously to basic operating procedures. <br /> 4.07 Emission measurement (exhaust gas analyser) <br /> Emission measurement by GE Jenbacher personnel, to verify that the guaranteed toxic agent emissions have <br /> been achieved (costs for measurement by an independent agency will be an extra charge). <br /> 5.01 Limits of delivery - Genset <br /> Electrical: <br /> • Genset: <br /> • At terminals of genset interface panel <br /> • At terminals of generator terminal box <br /> (screwed glands to be provided locally) <br /> • Genset control panel: <br /> At terminal strips <br /> • Auxiliaries: <br /> At terminals of equipment which is supplied separately <br /> Cooling water <br /> At inlet and outlet flanges on genset <br /> Exhaust gas <br /> At the exhaust gas exit of the engine <br /> Combustion air <br /> The air filters are set mounted <br /> Fuel gas <br /> • At inlet and outlet flange of gas train <br /> • At inlet flange of gas pipework on genset <br /> • At outlet flange of the pre-chamber gas train <br /> • At inlet flange of pre-chamber gas pipework on genset <br /> • At connection for boost pressure compensation on genset <br /> • At connection for boost pressure compensation on gas pressure regulator of the pre-chamber gas train <br /> Lube oil <br /> At lube oil connections on genset <br /> Draining connections and pressure relief <br /> At genset <br /> 19.04.2011/2 TS JGS616 E22 4160V April 19 2011 Ameresco Forward LFG-WES <br /> 30/32 <br />