Laserfiche WebLink
Insula#ion;'' <br /> Insulation'of heat exchangers, pipework and exhaust gas silencer is not included in our scope of supply and <br /> must be provided locally. <br /> First filling <br /> The first filling of genset, (lube oil, engine jacket water, anti freeze-, anti corrosive agent, battery acid) is not <br /> included in our scope of supply. <br /> The composition and quality of the used consumables are to be strictly monitored in accordance with the <br /> "Technical Instructions" of GE JENBACHER. <br /> Suitable bellows and flexible connections must be provided locally for all connections. <br /> Cables from the genset must be flexible. <br /> 5.02 Factory tests and inspections <br /> The individual module components shall undergo the following tests and inspections: <br /> 5.02.01 Engine tests <br /> Carried out as combined Engine-and Module test according to DIN ISO 3046 at GE Jenbacher test bench. <br /> The following tests are made at 100%, 75% and 50% load, and the results are reported in a test certificate: <br /> • Engine output <br /> • Fuel consumption <br /> • Jacket water temperatures <br /> • Lube oil pressure <br /> • Lube oil temperatures <br /> • Boost pressure <br /> • Exhaust gas temperatures, for each cylinder <br /> 5.02.02 Generator tests <br /> Carried out on the premises of the generator supplier. <br /> 5.02.03 Module tests <br /> The engine will be tested with natural gas(Russian Natural gas with methane number 94). The technical data <br /> according to the specification can only be demonstrated to a certain extent with the available natural gas. <br /> Carried out as combined Engine-and Module test commonly with module control panel at GE Jenbacher test <br /> bench, according to ISO 8528, DIN 6280. The following tests are made and the results are reported in a test <br /> certificate: <br /> Visual inspection of scope of supply per specifications. <br /> • Functional tests per technical specification of control system. <br /> • Starting in manual and automatic mode of operation <br /> • Power control in manual and automatic mode of operation <br /> • Function of all safety systems on module <br /> • Measurements at 100%, 75% and 50% load: <br /> • Frequency <br /> • Voltage <br /> • Current <br /> 19.04.2011/2 TS JGS616 E22 4160V April 19 2011 Ameresco Forward FFG-WES <br /> 31/32 <br />