My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2011_26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 8:17:55 PM
Creation date
7/3/2020 10:56:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_26
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2011_26.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Insula#ion;'' <br /> Insulation'of heat exchangers, pipework and exhaust gas silencer is not included in our scope of supply and <br /> must be provided locally. <br /> First filling <br /> The first filling of genset, (lube oil, engine jacket water, anti freeze-, anti corrosive agent, battery acid) is not <br /> included in our scope of supply. <br /> The composition and quality of the used consumables are to be strictly monitored in accordance with the <br /> "Technical Instructions" of GE JENBACHER. <br /> Suitable bellows and flexible connections must be provided locally for all connections. <br /> Cables from the genset must be flexible. <br /> 5.02 Factory tests and inspections <br /> The individual module components shall undergo the following tests and inspections: <br /> 5.02.01 Engine tests <br /> Carried out as combined Engine-and Module test according to DIN ISO 3046 at GE Jenbacher test bench. <br /> The following tests are made at 100%, 75% and 50% load, and the results are reported in a test certificate: <br /> • Engine output <br /> • Fuel consumption <br /> • Jacket water temperatures <br /> • Lube oil pressure <br /> • Lube oil temperatures <br /> • Boost pressure <br /> • Exhaust gas temperatures, for each cylinder <br /> 5.02.02 Generator tests <br /> Carried out on the premises of the generator supplier. <br /> 5.02.03 Module tests <br /> The engine will be tested with natural gas(Russian Natural gas with methane number 94). The technical data <br /> according to the specification can only be demonstrated to a certain extent with the available natural gas. <br /> Carried out as combined Engine-and Module test commonly with module control panel at GE Jenbacher test <br /> bench, according to ISO 8528, DIN 6280. The following tests are made and the results are reported in a test <br /> certificate: <br /> Visual inspection of scope of supply per specifications. <br /> • Functional tests per technical specification of control system. <br /> • Starting in manual and automatic mode of operation <br /> • Power control in manual and automatic mode of operation <br /> • Function of all safety systems on module <br /> • Measurements at 100%, 75% and 50% load: <br /> • Frequency <br /> • Voltage <br /> • Current <br /> 19.04.2011/2 TS JGS616 E22 4160V April 19 2011 Ameresco Forward FFG-WES <br /> 31/32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.