My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_27
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2011_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 8:38:02 PM
Creation date
7/3/2020 10:56:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2011_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
appropriate Subcontractors) and Quality Assurance personnel is essential. To this end, the <br />following meetings may be scheduled: <br />4.1 PRE -CONSTRUCTION MEETING <br />A Pre -Construction Meeting will be held at the site. At a minimum, the meeting shall be <br />attended by Allied Waste (or designated representative), the Construction Manager, the Engineer, <br />the Geotechnical CQA Consultant, the Contractor and the CQA staff. <br />Specific items to be considered at this meeting will include: <br />Any appropriate modifications to the CQA requirements. <br />• Review of the responsibilities of each party. <br />Review of the lines of authority and communication. <br />Review of work area security and safety protocol. <br />• Review of the procedures for project documentation and reporting, and distribution of <br />documents and reports. <br />Review of Contractor's proposed methods of construction (including equipment), with <br />specific emphasis on methods of select grading, trucking, stockpiling, processing, moisture <br />conditioning and compaction. <br />• Review of the procedures for field and laboratory CQA testing. <br />Establishment of procedures for correcting and documenting construction deficiencies. <br />Conducting a site inspection to discuss work areas, excavations, stockpile areas, mixing <br />tables, processing areas, lay -down areas, access roads, haul roads, and related items. <br />6 Review of the project schedule. <br />The meeting shall be documented by the Construction Manager and minutes shall be distributed <br />to all parties. <br />4.2 WEEKLY PROGRESS MEETINGS <br />Progress Meetings should be held weekly. At a minimum, these meetings should be attended by <br />Allied Waste (or designated representative), the Construction Manager, the CQA Officer and/or <br />the CQA Monitor(s), and the Contractor. The purpose of these meetings is to: <br />Discuss any health and safety related issues. <br />0 9 Review scheduled work activities. <br />GLV200SOOSVFORWARD/CQAPLAN.doe/7/15/2005 <br />Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.