0 . Review Contractor performance. <br />• Discuss project related problems. <br />Discuss the Contractor's personnel and equipment assignments. <br />o Review the previous week's activities and accomplishments. <br />Weekly progress meetings shall be documented by the Construction Manager or his <br />representative and minutes shall be distributed to all parties. <br />4.3 SPECIAL MEETINGS <br />Special meetings will be conducted as required to discuss problems or deficiencies. At a <br />minimum, these meetings will be attended by the Construction Manager, the CQA staff and the <br />Contractor. If the correction of a problem requires a design modification, the <br />Engineer and the Geotechnical CQA Consultant will also be present. The purpose of these <br />meetings is to: <br />• Define and discuss any problems or deficiencies in the project. <br />• Review possible corrective actions or solutions. <br />0 , Implement an action plan to resolve the problems or deficiencies. <br />n <br />Special meetings shall be documented by the Construction Manager or his representative and <br />minutes shall be distributed to all parties. <br />5.1 GENERAL <br />The following earthwork requirements present the generally accepted standards and minimum <br />requirements for earthwork grading operations to be used in development of the project. These <br />specifications shall be the project requirements for earthwork except where specifically <br />superseded by prevailing guidance documents of the controlling agency. <br />5.2 SPECIFICATIONS <br />A. The Contractor shall be solely responsible for the satisfactory completion of all earthwork in <br />accordance with the Project Drawings and Specifications. <br />B. Equipment used in the excavation, transport, mixing, stockpiling, processing, installation and <br />compaction of all materials used in construction of the alternative final cover improvements <br />GLA/M"OSVFORWARD/CQAPLAN.dod7/i SaOOS <br />-9- <br />Geologic Associates <br />