My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2024 1:48:16 PM
Creation date
7/3/2020 10:56:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2015
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
637
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Landfill0 <br /> 2 23 May L013 ` <br /> San Joaquin County <br /> ..t <br /> 5 <br /> Figure 1: Working face at Forward Landfill (Austin Figure 2: Looking northeast from the top surface of <br /> Road Cell). 10 May 2013 the Austin Road Cell. The cell is the ET cover. <br /> Vegetation appears to be sparse and may be the <br /> result of the past dry winter. The stormwater runoff <br /> controls, should be inspected and repaired as nec- <br /> essary prior to the next wet season. The slope <br /> should also be hydroseeded before the next wet <br /> season. <br /> ♦k <br /> z <br /> Figure 3; Looking north from the top deck of the Aus- Figure 4: Forward landfill is installing a new landfill <br /> tin Road Cell. The downspouts will be cleaned out gas to energy plant at their facility. The new plant <br /> prior to the next wet season. will be completed by the end of the summer 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.